Real Life Ministries Feasibility Study (Gold’s Gym)

SPOKANE, WA


Provided a feasibility study for B2 Architecture to convert an existing Gold’s Gym into a new church worship facility that required as minimal revisions as possible. This structure was an existing 20,000 s.f., Type IIB, 2-story building that was converted into useful assembly spaces and offices spaces to serve the needs of the client.

Back To Code Consulting
Previous
Previous

Pacific Tower

Next
Next

Bothell Gateway